Sewage Work | Dammam, Saudi Arabia
Normal Frequency(NF)
Sewage pipes were laid by forming a wall with 7-8 m sheet pilings on sandy land. Due to the difficult ground conditions in the project, the SVR 25 NF machine was used, but since the excavator was strong enough, the machine was operated without the need for a crane.